Contractor's Notes 11-29-10
Hello Everyone,
Just a quick note before tomorrow’s meeting:
The foundation has been poured. The guys will be stripping the forms tomorrow.
The front porch footings passed inspection.
The recycled insulation boards are getting delivered tomorrow and installed Thursday. Once they are installed the inspector will come back out (informally he said it looked great).
The FSC lumber is getting dropped off Friday, then they can start framing.